Ammonia

C-LNG’s Ammonia Fuel Gas Supply System Design has received AIP from both BV and ABS. As an SGMF Member, we actively contribute by sharing our expertise in working groups such as WG42(Ammonia) and WG44(New-Build IGF Code Vessels).

Ammonia Fule Supply System:

The Ammonia Fuel Supply System is designed to safely store, condition, and deliver ammonia fuel to the vessel’s main engine, supporting the maritime industry’s transition toward low-carbon and carbon-free propulsion solutions. The system manages critical functions including pressure regulation, temperature control, and precise fuel metering to ensure stable and reliable ammonia supply under all engine operating conditions. Built with robust safety features such as leak detection, ventilation, and emergency shutdown systems, this equipment addresses the unique handling requirements of ammonia as a marine fuel — including its toxicity and corrosivity — while enabling efficient combustion performance and compliance with evolving maritime emissions regulations.

Ammonia Fuel Supply System (For 2 Stroke Main Engine)

Description Technical Data
Main Engine Type WinGD X52/62/72-A-1.0, ME-LGIA 2 Stroke Engine
Engine Power 5100 – 18000KW
Fuel Composition Liquid Ammonia
Required Flow 1800kg/hr ~ 5500kg/hr
Supply Pressure 83barg +/- 2barg
Supply Temperature 40 +/- 5 °C
Fuel Supply Purity 10µm
System Design Pressure 100 barg
Main System Skids Ammonia HP Pump Skid, Ammonia Heat & Supply Skid, Ammonia Vapor Catch & Mitigation Skid, Water/Glycol Skid
Class / Approval Customer Requirement

Ammonia Fuel Supply System(For Himsen 4 Stroke Main Engine)

Description Technical Data
Main Engine Type HiMSEN H22CDF 4 Stroke Engine
Engine Power 1400 – 2200KW
Fuel Composition Liquid Ammonia
Required Flow 850kg/hr ~ 1280kg/hr
Supply Pressure 83barg +/- 2barg
Supply Temperature 40 +/- 5 °C
Fuel Supply Purity 10µm
System Design Pressure 100 barg
Main System Skids Ammonia HP Pump Skid, Ammonia Heat & Supply Skid, Ammonia Vapor Catch & Mitigation Skid, Water/Glycol Skid
Class / Approval Customer Requirement